Supply and logistics
We equip the site to the specification and bring the equipment when it is needed on site
A failed delivery stops installation, and wrong items or defects surface on site. We take responsibility for equipping the site: the equipment arrives complete, in working order and on time.
- We equip the site to the project specification: luminaires, power supplies, control systems, fasteners and components.
- Every batch passes incoming quality control before shipment to the site.
- We align the delivery schedule with the installation schedule, so the site never waits.
- We keep our own warehouse in Yekaterinburg for quick top-ups.
Supply and logistics
Send us the specification — we will prepare an offer on the equipment set and delivery times
How delivery works
1
Specification review
We check the specification, propose alternatives where needed and fix the composition of the delivery.
2
Schedule
We agree the timing and sequence of deliveries with the general contractor and the installation company.
3
Incoming control
We check completeness, labelling and operability of the equipment before shipment.
4
Delivery to the site
We bring the equipment to the site with documents and hand it over against an acceptance act.
It is convenient to combine supply with supervised installation: our engineers will control the installation of the equipment we delivered and help with commissioning.